Here are some pictures of the wonderful vinyl job we recently did in April. We demoed, prepped, and installed approximately 1,800 sq yds of vinyl on 2 decks in 7 days.
The groundwork before we started:
![](https://o.b5z.net/i/u/10112785/i/dscn1734.jpg)
![](https://o.b5z.net/i/u/10112785/i/dscn1666.jpg)
MAPEI Primer L to help prepare the floor:
![](https://o.b5z.net/i/u/10112785/i/dscn1747.jpg)
MAPEI Ultraplan Plus for a strong cementitious foundation:
![](https://o.b5z.net/i/u/10112785/i/dscn1736.jpg)
![](https://o.b5z.net/i/u/10112785/i/DSCN1846.JPG)
While the floor is getting prepped, we have a team measuring, precutting, and staging the vinyl:
![](https://o.b5z.net/i/u/10112785/i/DSC00082.JPG)
Laying down the vinyl:
Vinyl Welding:
We laid down blue vinyl for the main corridors, yellow for the side hallways, and red along the back corridors.
![](https://o.b5z.net/i/u/10112785/i/DSCN1824_cropped.jpg)
![](https://o.b5z.net/i/u/10112785/i/DSCN2234.JPG)